CASE Tool 9-1: A Guideline Addressing Coordination and Completeness of Structural Construction Documents
Inadequate and/or incomplete design drawings often result in inaccurate competitive bids; delays in schedule; a multiplicity of requests for information (RFIs), change orders and revision costs; increased project costs; and a general dissatisfaction with the project. The guidelines presented in this document will assist not only the structural engineer of record (SER) but also everyone involved with building design and construction in improving the process by which the owner is provided with a successfully completed project.
There are two PDF files included with the Tool: one with Tool 9-1 and the other with the CASE Drawing Review Checklist.