Available for immediate download in MS Word format. Hard copy not available.
This
document is used by a project owner to retain an Owner’s Advisor to serve in an
advisory capacity for the delivery of the project. The Owner typically retains
an Owner’s Advisor when using the Construction Manager at Risk (CMAR) project
delivery method. The OA assists with selecting a CMAR, preparing Contract Documents
(not including the design documents, which are prepared by the Engineer), and
administering the contract between the Owner and the CMAR.